文章分类
文章检索
032023-07
Solar photovoltaic power sold to the national grid is no lon
Recently, a news let Shizhu Town Xialixi village villagers Zhang Kangxun excited. 
032023-07
Cuba opens fibre-optic cables and simulcasts foreign televis
International Online news (Reporter Yan Ming) : Recently, Cuba opened the first submarine fiber optic cable, making the speed of data entering Cuba in a single direction has improved to a certain extent. Although there is still a long way to go to achieve the goal of "real Internet freedom for the people", this is a real step on the road to "change" in Cuba. At the same time, Cuban television also broadcast a foreign broadcaster"s TV program for the first time in nearly 50 years in Cuba. 
032023-07
In 2008, Wenzhou power grid annual infrastructure production
At the end of 2008, Wenzhou ushered in the peak of power grid infrastructure operation, Wenzhou electric power people after a year of hard work finally harvested a huge sweet fruit. On December 20, the 500 kV Tianzhu Transformation No. 3 main transformation expansion project was put into operation smoothly, with a new capacity of 1 million kVA; On December 22, 110 kV new power transmission and transformation and expansion projects were put into operation smoothly; On December 23, the 35 kV Longjiang Line was successfully put into operation. At this point, in 2008, the Wenzhou power grid infrastructure production capacity reached 3.46 million KVA, greatly exceeding the "completion and operation of 3 million KVA" goal proposed at the beginning of the year, for the Wenzhou power grid infrastructure production drew a perfect end. 
032023-07
The ice-resistant reinforcement project of Hubei power grid
Wuhan Morning Post (reporter Gong Ping correspondent Liao Qitao) yesterday learned from the provincial power company that the province's large-scale, investment of nearly 600 million yuan of power grid ice reinforcement project completed, Hubei power grid has begun to fight against 50 years of ice disaster capacity. 
032023-07
Areva once again joined hands with Xiamen Huadian to acceler
As 2008 drew to a close, Areva opened another city in China. Its new joint venture with Xiamen Huadian Switch Co., LTD. (" Xiamen Huadian "), "Areva Transmission and Distribution Huadian Switch (Xiamen) Co., LTD." (" Areva Huadian "), completed the formal business registration on December 22, 2008. 
032023-07
Longyuan added 1.2 million kilowatts of wind power to contin
"Wind power giant" Longyuan Group again spread good news: December 30, 2008, with the Heilongjiang Yilan Yunling and other three wind power projects put into operation, China Guodian Longyuan Power Group Company successfully exceeded 1.2 million kilowatts of new wind power installed capacity this year, successfully achieved the annual project construction target. At this point, the total cumulative installed capacity of wind power of Longyuan Group reached 2.63 million kilowatts, continuing to lead the national wind power industry. 
032023-07
Warm congratulations to Zhejiang Li 'an Cable Co., Ltd. webs
Warm congratulations to Zhejiang Li 'an Cable Co., Ltd. website online! 
自定内容

News

脚注信息

Contact us
Post: 318050
Tel: +86-576-82350158
Transmission: +86-576-82352988
E-mail:cai_chunfang@126.com
Add: No.2 Luyang Road, Luqiao District, Taizhou City, Zhejiang Province